Nov
01
Efficient Approach Dramatically Reduces Turbine Noise at CCGT Power Stations Ten years after it was first used at Uskmouth, this innovative approach to soundproofing that reduces insulation depth by up to 76%, is once again commissioned in France. Dangerous Levels of Noise Modern dry cooling systems offer many benefits...
read more →
Jan
20
Nine Elms Parkside: Under Screed Acoustic Layer When carrying out a large-scale housing development it pays to rely on tried and tested products to provide acoustic certainty. Regupol 7210C (REGUPOL sonus core 5) is one such product. With a long history of reliability, it is now being installed in the UK’s...
read more →
Jan
20
Project: AstraZeneca HQ, Cambridge Product: Fade acoustic plaster Quantity: 4200m2 Main Contractor: Mace Subcontractors: CMS Danskin Architect: Herzog & de Meuron Value of Overall Project: £50 Million + Introduction: AstraZeneca Acoustic Plaster Case Study After starting the project with Skanska as lead contractors, in 2019 AstraZeneca switched to their current...
read more →
Jul
06
The redevelopment of Gainsborough’s House in Suffolk required specialist acoustic design to isolate the structure from the vibrations of a nearby silk mill. Regupol Vibration offered a practical solution, but the project was not without its challenges, including a tight site and lockdown restrictions. The Project Gainsborough’s House is the...
read more →
Jun
09
Project: Jodrell Bank Main Contractor: Sir Robert McAlpine Ltd Subcontractor/installer: Sound Interiors Ltd Architect: Hassell Product: SuperPhon Overall Project Value: £16 million Quantity: 56 triangular and 26 circular acoustic rafts Hassel Architects and Robert McAlpine contractors collaborate on The First Light Pavillion, nestled in the Cheshire countryside at Jodrell Bank....
read more →
Feb
17
When a suitable site was finally found for Hard...
read more →
Feb
17
CMS Danskin were able to provide Regupol 4515 (REGUPOL sonus eco) to the prestigious new Gateway project in central Leeds. As the city centre’s largest residential project to date,...
read more →
Feb
17
Located in a densely populated area of London, the Balham branch of Waitrose had a responsibility to minimise the impact of its operations on the surrounding neighbourhood. Supermarkets are deceptively noisy, a solution was required in order to maintain low...
read more →
Feb
17
The extensively refurbished Four Seasons Hotel London at Park Lane required an acoustic underlay solution to effectively control impact sound with the marbled tiled floors of its guest bathrooms. Due to the prestigious nature of the hotel, superior impact...
read more →
Feb
17
The Royal Shakespeare Theatre in Stratford-upon-Avon has undergone an ambitious and exciting £112m project to install a brand new auditorium inside the skeleton of the art-deco original. The internal refit created some interesting acoustical...
read more →
« Previous Page — Next Page »